The best Side of Cast in Situ Piles in Dhaka
As observed through the figure under, ongoing auger is accustomed to drill the borehole, raise up drilled soil, and pour concrete although the auger is moved up. Because of this, the borehole will not want casing or hydrostatic pressure to stop harm to the borehole wall.Visitors congestion proceeds being a major problem in city transportation setti